{"id":15717,"date":"2016-10-20T07:05:59","date_gmt":"2016-10-20T14:05:59","guid":{"rendered":"http:\/\/wabikes.org\/?p=15717"},"modified":"2016-10-18T18:44:09","modified_gmt":"2016-10-19T01:44:09","slug":"john-wayne-pioneer-trail-recap-state-funding-2017-request","status":"publish","type":"post","link":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/","title":{"rendered":"John Wayne Pioneer Trail Recap and 2017 State Funding Request"},"content":{"rendered":"<div id=\"attachment_15464\" style=\"width: 310px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-15464\" class=\"wp-image-15464\" src=\"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg\" alt=\"Riding toward the east portal of the Boylston Tunnel in the Yakima Training Center grounds. Photo by Mike Sorensen (used by permission).\" width=\"300\" height=\"199\" srcset=\"https:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg 400w, https:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-768x509.jpg 768w, https:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-700x464.jpg 700w, https:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016..jpg 960w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-15464\" class=\"wp-caption-text\">Riding toward the east portal of the Boylston Tunnel in the Yakima Training Center grounds. Photo by Mike Sorensen (used by permission).<\/p><\/div>\n<p>Protecting and funding the John Wayne Pioneer Trail will be one of Washington Bikes&#8217; priorities heading into the 2017 legislative session and beyond.\u00a0<a href=\"http:\/\/wabikes.org\/2015\/10\/07\/briefing-john-wayne-pioneer-trail\/\">The threat to the trail&#8217;s public ownership that emerged at the tail end of the 2015 legislative capital budget process<\/a>\u00a0ironically has served to galvanize widespread public support for the trail &#8212; <a href=\"http:\/\/www.johnwaynepioneertrail.org\/\">Friends of the John Wayne Pioneer Trail<\/a> formed not just to protect it but to promote, maintain, and develop <a href=\"http:\/\/wabikes.org\/2014\/12\/16\/trails-and-more-number-1-in-washington-state\/\">the nation&#8217;s longest rail-trail<\/a>. At their board retreat in September in South Cle Elum the Friends discussed formation of a coalition and development of a common legislative strategy that can be supported by a broad range of interests.<\/p>\n<div class=\"_n_j3\">\n<div class=\"conductorContent\" tabindex=\"-1\">\n<div id=\"primaryContainer\" class=\"_n_e\">\n<div class=\"conductorContent\" tabindex=\"0\">\n<div class=\"_n_N\" tabindex=\"-1\">\n<div class=\"_n_T\">\n<div class=\"_n_T\">\n<div class=\"_n_U\">\n<div class=\"allowTextSelection\">\n<div class=\"conductorContent\">\n<div class=\"_rp_d5 ShowReferenceAttachmentsLinks\" tabindex=\"-1\">\n<div class=\"_rp_d5 disableTextSelection\">\n<div class=\"_rp_g5 disableTextSelection customScrollBar scrollContainer\">\n<div class=\"_rp_o5\">\n<div class=\"_rp_l5\">\n<div class=\"_rp_m5 rpHighlightAllClass rpHighlightBodyClass allowTextSelection\">\n<div class=\"_rp_n5 ms-font-weight-regular ms-font-color-neutralDark\" tabindex=\"0\">\n<div class=\"rps_a81f\">\n<div lang=\"EN-US\">\n<div class=\"x_WordSection1\">\n<p class=\"x_MsoNormal\">[Tweet &#8220;I signed up for @WABikes enews so I won&#8217;t miss #WAleg alerts to help fund\/protect John Wayne Pioneer Trail. Join me. #trails #JWPT&#8221;]<\/p>\n<div id=\"attachment_15723\" style=\"width: 310px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-15723\" class=\"wp-image-15723\" src=\"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/10\/Friends-of-JWPT-Sept2016-BoardMeetingguests-Johnfloberg-BarbChamberlain-JonSnyder-400x202.jpg\" alt=\"Guest panel members John Floberg (WA State Parks Foundation Executive Director), Barb Chamberlain (Chief Strategic Officer for WA Bikes\/Cascade Bicycle Club) and Jon Snyder (WA Outdoor Recreation and Economic Development Policy Advisor) answered questions at the Friends of JWPT board retreat. (Picture courtesy of Friends of the John Wayne Pioneer Trail)\" width=\"300\" height=\"152\" srcset=\"https:\/\/wabikes.org\/wp-content\/uploads\/2016\/10\/Friends-of-JWPT-Sept2016-BoardMeetingguests-Johnfloberg-BarbChamberlain-JonSnyder-400x202.jpg 400w, https:\/\/wabikes.org\/wp-content\/uploads\/2016\/10\/Friends-of-JWPT-Sept2016-BoardMeetingguests-Johnfloberg-BarbChamberlain-JonSnyder.jpg 433w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-15723\" class=\"wp-caption-text\">Guest panel members John Floberg (<a href=\"http:\/\/wspf.org\/\">WA State Parks Foundation<\/a> Executive Director), Barb Chamberlain (Chief Strategic Officer for Washington Bikes\/<a href=\"http:\/\/www.cascade.org\">Cascade Bicycle Club<\/a>) and Jon Snyder (WA Governor&#8217;s Outdoor Recreation and Economic Development Policy Advisor) answered questions at the Friends of JWPT board retreat. (Picture courtesy of Friends of the John Wayne Pioneer Trail)<\/p><\/div>\n<h3 class=\"x_MsoNormal\">Update from State Parks and Recreation Commission<\/h3>\n<p class=\"x_MsoNormal\">This recap below from\u00a0Peter Herzog, Assistant Director of the <a href=\"http:\/\/parks.state.wa.us\/\">Washington State Parks and Recreation Commission<\/a>, provides a concise description of how State Parks has responded to legislative threats and questions about trail management, along with the budget priorities that came out of the Advisory Committee that met several times in 2015.\u00a0<strong>Development of an agency&#8217;s recommended budget request is an important step in preparing for the legislative session. We thank the Advisory Committee, State Parks and Recreation Commission, and Parks staff for their work on this.<\/strong><\/p>\n<p class=\"x_MsoNormal\">(Note on usage: The John Wayne Pioneer Trail is also known as the Iron Horse State Park Trail.)<\/p>\n<h3 class=\"x_MsoNormal\"><b><u>State Parks and Recreation Commission Actions in July at Clarkston <\/u><\/b><\/h3>\n<p class=\"x_MsoNormal\">The initial phase of the planning process ended in July with formal adoption by the State Parks and Recreation Commission of a management plan for the trail section from Lind to Malden (see PDF\u00a0<b class=\"fs16\"><span class=\"fs16\"><a class=\"imCssLink\" href=\"http:\/\/parks.state.wa.us\/DocumentCenter\/Home\/View\/7653\">Iron Horse State Park Trail<\/a>\u00a0<\/span><\/b><span class=\"fs16\"><span class=\"fs16\"><b><a class=\"imCssLink\" href=\"http:\/\/parks.state.wa.us\/DocumentCenter\/Home\/View\/7653\">Recommendations Report<\/a>)<\/b><\/span><\/span>. The plan includes:<\/p>\n<ul>\n<li class=\"x_MsoNormal\">A resolution expressing <strong>commitment to Washington\u2019s cross-state trail system<\/strong> and authorizing the Director to work with private and public entities to achieve a cross-state trail system. ;<\/li>\n<li class=\"x_MsoNormal\"><strong>Land classifications for the trail<\/strong> which are essentially internal zoning for the trail corridor that provides guidance on the intensity of use and development;<\/li>\n<li class=\"x_MsoNormal\">A <strong>long-term park boundary<\/strong> identifying the area desired for future recreation trail management, which includes the DNR-managed portion of the old Milwaukee Road corridor, the active rail line between Port of Royal Slope and Warden, and all public and private property gaps between Lind and Malden.<\/li>\n<li class=\"x_MsoNormal\">Direction to staff to work with trail stakeholders to <strong>recommend a new trail name<\/strong> that considers establishing a broadly recognizable and marketable identity for the trail;<\/li>\n<li class=\"x_MsoNormal\">Direction to work with the Washington Department of Natural Resources (DNR) to develop a <strong>transition plan for the DNR-managed trail corridor<\/strong> between the Columbia River at Beverly Bridge and Lind, with a goal of eventual management by State Parks. In Parks\u00a0conversations with DNR they have indicated a desire to move such a transition forward.<\/li>\n<\/ul>\n<h3 class=\"x_MsoNormal\"><b><u>New State Parks Area Manager <\/u><\/b><\/h3>\n<p class=\"x_MsoNormal\">State Parks is pleased to introduce new Area Manager, Audra Sims,<b> <\/b>for the trail segment between Lind and the Idaho Border. Audra also has the Columbia Plateau State Park Trail in her portfolio, along with a number of other parks in the Blue Mountain Park Area.\u00a0 She comes with a strong background in state parks, general recreation and resource protection.<\/p>\n<p class=\"x_MsoNormal\">Her first order of business will be the hiring of vacant ranger positions, including her primary assistant and another park ranger. These key hires in themselves will provide a larger measure of responsiveness and presence along the linear trails in her area. As she transitions into her new role, Audra will develop a strategy to best use social media and traditional meetings to provide interested parties and adjacent property owners with updates on trail work and news.<\/p>\n<h3 class=\"x_MsoNormal\"><b><u>Ongoing Stakeholder Group<\/u><\/b><\/h3>\n<p class=\"x_MsoNormal\">Based on direction provided by the State Parks and Recreation Commission, staff is developing a process to work with trail stakeholders on an ongoing basis.\u00a0\u00a0 Initial items for the stakeholder consideration include a new trail name and improving the trail permit and property owner notification process.\u00a0We expect this stakeholder group to be making recommendations to Commission in 2017.<\/p>\n<h3 class=\"x_MsoNormal\"><b><u>2017-19 Capital Budget Request<\/u><\/b><\/h3>\n<p class=\"x_MsoNormal\">The State Parks and Recreation Commission authorized staff to submit a statewide capital budget totaling approximately $96 million.\u00a0 State Parks\u2019 capital budget request includes several projects for Iron Horse State Park (see PDF <b><a class=\"imCssLink\" href=\"http:\/\/www.johnwaynepioneertrail.org\/files\/Iron-Horse-Capital-and-Grant-17-19.pdf\">Recommended State Capital and Grant Projects \u2013 2017-19 Biennium<\/a>)<\/b>. These include:<\/p>\n<h4 class=\"x_MsoNormal\"><strong><span id=\"0.6846558536883092\" class=\"highlight\">John<\/span> <span id=\"0.7318247653004535\" class=\"highlight\">Wayne<\/span> Pioneer Trail Lind to Malden Phase 1 Development ($1,539,000)<\/strong><\/h4>\n<p class=\"x_MsoNormal\">This is the\u00a0first of several phases for the trail segment between Lind and Malden.\u00a0 Future phases will address construction of the Cow Creek Trestle, repair of the tunnels and trestles at Rock Lake and construction of the trailheads. \u00a0Cost for this phase has been revised from earlier estimates. The first phase includes:<\/p>\n<ul>\n<li class=\"x_MsoNormal\">Design and engineering for Cow Creek Trestle located between Marengo and Ralston,<\/li>\n<li class=\"x_MsoNormal\">Design and engineering tunnels 43 and 44 and trestles EE-128 and EE-130 along Rock Lake,<\/li>\n<li class=\"x_MsoNormal\">Rock fall scaling and removal along Rock Lake, and<\/li>\n<li class=\"x_MsoNormal\">Design and permitting for trailheads at Kenova, Rock Lake, Revere, Marengo, Ralston, and Lind.<\/li>\n<\/ul>\n<h4><\/h4>\n<h4><strong>Tekoa and Rosalia Trailheads ($999,000)<\/strong><\/h4>\n<p class=\"x_MsoNormal\">This project will develop trailhead facilities including sanitary facilities, parking, and orientation signing at Tekoa and Rosalia.<\/p>\n<h4 class=\"x_MsoNormal\"><strong>John Wayne Trail &#8211; Repair Tunnels Trestles Culverts Ph. 3 ($606,000)<\/strong><\/h4>\n<p class=\"x_MsoNormal\">This phased project addresses continued implementation of the Iron Horse State Park Trail Master Plan and will complete needed assessments and repairs to trail trestles, tunnels, culverts, and surfacing within Iron Horse State Park Trail west of Lind. The project will also develop trailheads, campsites, restrooms, and other trail facilities.\u00a0 This project will also address the Surface Drainage Liner over the Tunnel 50 East Portal.\u00a0 The first biennium will address design and permitting.\u00a0 Construction will occur during subsequent biennia and is anticipated to cost approximately $4.3 million.<\/p>\n<h4 class=\"x_MsoNormal\"><strong>Kittitas Depot Stabilize and Upgrade Foundation ($110,000)<\/strong><\/h4>\n<p class=\"x_MsoNormal\">This project did not make the final capital budget request and may be pursued in future biennia.<\/p>\n<h3 class=\"x_MsoNormal\"><b><u>Grant Requests<\/u><\/b><\/h3>\n<p class=\"x_MsoNormal\">State Parks has secured grant funding for several projects and is seeking additional grant funds to improve Iron Horse State Park Trail.\u00a0 Projects include:<\/p>\n<h4 class=\"x_MsoNormal\"><strong>Malden to Rosalia Grading, Graveling, and Trailheads\u00a0($1,745,000)<\/strong><\/h4>\n<p class=\"x_MsoNormal\">State Parks has submitted a 2017-19 Washington Wildlife and Recreation Program (WWRP) grant request to permit and construct grading and surfacing improvements to the 9-mile section of Iron Horse State Park Trail between the towns of Malden and Rosalia, as well as adding a trailhead facility in Malden.\u00a0 The primary intent of this project is to upgrade the trail to a standard consistent with the other improved sections of the trail and to make this section accessible under the Americans with Disabilities Act (ADA).<\/p>\n<p class=\"x_MsoNormal\">The project scope includes reducing the grade in five areas (road crossings\/former bridge sites) to 10% or less and surfacing the trail with crushed rock. The project would also likely include signing and gates.\u00a0 State Parks has a grant from the State Recreation and Conservation Office (RCO) for $20,000 and a donation of $40,000 from the estate of <span id=\"0.7586271616258964\" class=\"highlight\">John<\/span> Kono to complete design and engineering for the project.\u00a0 Bid-ready construction documents will be complete by October 2016.\u00a0 State Parks anticipates applying for an approximately $1,200,000 grant and additional funds donated by the Kono estate for construction in the 2017-19 biennium.\u00a0 This grant proposal will also include construction of a trailhead facility in Malden.<\/p>\n<h4 class=\"x_MsoNormal\"><strong>Renslow Trestle ($1,246,000)<\/strong><\/h4>\n<p class=\"x_MsoNormal\">State Parks has submitted a WWRP grant request to renovate the 680-foot-long historic Renslow Trestle that connects two portions of the Iron Horse Trail separated by I-90 between the town of Ellensburg and the Columbia River. Built in the early 1900s, the Renslow Trestle is one of Washington state\u2019s iconic steel structures used to carry trains of the Minnesota St. Paul Railway over large geographical gaps throughout the West. New concrete decking, railing, and safety fencing on the Renslow Trestle will improve safety and will complete the &#8220;missing link&#8221; eliminating the last arduous and convoluted detour between Ellensburg and the Columbia River, resulting in 32 miles of continuous trail. Crossing the renovated trestle will also add a new and exciting element to the Iron Horse experience.<\/p>\n<h4 class=\"x_MsoNormal\"><strong>Tekoa Trestle ($1,534,000)<\/strong><\/h4>\n<p class=\"x_MsoNormal\">State Parks has submitted a WWRP grant request to complete design, permit, and construction improvements to the 975-foot Tekoa trestle. The project would add concrete decking to the steel railroad trestle and install safety railings, making the bridge usable by hikers, cyclists, and equestrians.<\/p>\n<h4 class=\"x_MsoNormal\"><strong>Tekoa Trailhead Acquisition<\/strong><\/h4>\n<p class=\"x_MsoNormal\">State Parks has secured funding and is in the process of acquiring land for a trailhead in Tekoa. We anticipate acquisition of this property to be completed by June 2017. Funding for this acquisition came from WWRP. While the grant request for this property was originally $1,000,000, we expect the final cost of acquisition to be significantly less.<\/p>\n<h3 class=\"x_MsoNormal\"><b><u>2017-19 Operating Budget Request<\/u><\/b><\/h3>\n<p class=\"x_MsoNormal\">State Parks has incorporated $400,000 into its statewide operations budget package for Iron Horse services. These funds are intended to provide an on-trail staff presence as well as non-staff costs including noxious weed spraying contracts, sterilant application for the trail surface, signs, fencing and gates.<\/p>\n<h3 class=\"x_MsoNormal\"><b><u>Work Underway to Address Concerns Raised by Adjacent Property Owners<\/u><\/b><\/h3>\n<p class=\"x_MsoNormal\"><strong>Maintenance:\u00a0<\/strong>State Parks completed four weeks of Washington Conservation Corps (WCC) crew time working on removing vegetation and clearing rock fall along Rock Lake, including one week of excavator time working on rock clearing to allow vehicle access. They are continuing to collect mapping and location data for weeds, fencing, and other issues along the trail. State Parks has been meeting and coordinating with weed board representatives in Adams and Whitman County. Trail staff has been meeting with adjacent landowners as the opportunity arises to address their concerns.<\/p>\n<p class=\"x_MsoNormal\"><strong>Staffing:\u00a0<\/strong>Parks\u00a0extended the\u00a0existing trail staff position into the next biennium and they look forward to evaluating options in the 2017-19 budget for a permanent staff model that allows them\u00a0to continue basic stewardship.<\/p>\n<p class=\"x_MsoNormal\"><strong>Fall\/winter maintenance:\u00a0<\/strong>This fall and winter, staff will mow areas of heavy vegetation, spray sterilant on the trail, repair and\/or replace gates and start to work in areas with identified adjacent property owner fencing issues. State Parks is in the process of developing a plan for the work that will occur\u00a0in 2017.<\/p>\n<h3 class=\"x_MsoNormal\"><strong><u>Motorized Non-Recreation Trail Use Permits <\/u><\/strong><\/h3>\n<p class=\"x_MsoNormal\">In September\u00a0State Parks staff traveled to eastern Washington and met with nine farmers and ranchers to discuss the best method to authorize their reasonable motorized use of the trail. These discussions have resulted in a plan to tailor one version of the motorized use permit for agricultural uses and another version for ranchers. Also of significance is the fact that all nine applicants have agreed to provide annual trail improvements and trail maintenance in lieu of paying any form of annual rent.<\/p>\n<p class=\"x_MsoNormal\">State Parks\u00a0has\u00a0been working initially with Brandon Spencer and he has agreed to assist State Parks staff in contacting and developing agreements with other ranchers along the trail. State Parks staff expects to provide all current motorized use applicants with a permit offer prior to December 1, 2016.\u00a0 Following this initial round of permit offers, staff will work to identify any additional landowners who may require reasonable use of the trail to manage their farm or ranch but to date have not contacted State Parks.<\/p>\n<p class=\"x_MsoNormal\"><strong><a href=\"http:\/\/wabikes.org\/act-now\/email-signup\/\">Sign up for the Washington Bikes e-news<\/a> to stay on top of action alerts when it&#8217;s time to speak up in the legislature and in your town for the JWPT and other trails and bike connections.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Protecting and funding the John Wayne Pioneer Trail will be one of Washington Bikes&#8217; priorities [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[18,34,45,44,85,14],"tags":[455,481,237],"class_list":["post-15717","post","type-post","status-publish","format-standard","hentry","category-advocacy","category-alert","category-bike-funding-policy-wa","category-bike-issues-advocacy","category-legislature","category-trails","tag-john-wayne-pioneer-trail","tag-state-parks","tag-trails-2"],"jetpack_publicize_connections":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v23.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>John Wayne Pioneer Trail Recap and 2017 State Funding Request - Washington Bikes<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"John Wayne Pioneer Trail Recap and 2017 State Funding Request - Washington Bikes\" \/>\n<meta property=\"og:description\" content=\"Protecting and funding the John Wayne Pioneer Trail will be one of Washington Bikes&#8217; priorities [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/\" \/>\n<meta property=\"og:site_name\" content=\"Washington Bikes\" \/>\n<meta property=\"article:published_time\" content=\"2016-10-20T14:05:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-10-19T01:44:09+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg\" \/>\n<meta name=\"author\" content=\"Barb Chamberlain\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Barb Chamberlain\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/\",\"url\":\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/\",\"name\":\"John Wayne Pioneer Trail Recap and 2017 State Funding Request - Washington Bikes\",\"isPartOf\":{\"@id\":\"https:\/\/wabikes.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg\",\"datePublished\":\"2016-10-20T14:05:59+00:00\",\"dateModified\":\"2016-10-19T01:44:09+00:00\",\"author\":{\"@id\":\"https:\/\/wabikes.org\/#\/schema\/person\/a5601f2a2a881e2c8aa5d20933d90e10\"},\"breadcrumb\":{\"@id\":\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#primaryimage\",\"url\":\"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg\",\"contentUrl\":\"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/wabikes.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"John Wayne Pioneer Trail Recap and 2017 State Funding Request\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wabikes.org\/#website\",\"url\":\"https:\/\/wabikes.org\/\",\"name\":\"Washington Bikes\",\"description\":\"People who bike make a difference\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wabikes.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/wabikes.org\/#\/schema\/person\/a5601f2a2a881e2c8aa5d20933d90e10\",\"name\":\"Barb Chamberlain\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/wabikes.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d4f2c2bb75879f5f06b9f567bc51f408?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d4f2c2bb75879f5f06b9f567bc51f408?s=96&d=mm&r=g\",\"caption\":\"Barb Chamberlain\"},\"description\":\"Barb joined Washington Bikes as executive director Aug. 1, 2012, and led its merger with Cascade Bicycle Club that became official Jan. 1, 2016. She serves both organizations as Chief Strategic Officer. Her bike advocacy work started in Spokane thanks to WA Bikes (then called the Bicycle Alliance of Washington), which served as the initial inspiration and fiscal home for Bike to Work Spokane, founded by Barb in late 2007. She has served on a variety of boards and committees in transportation, public policy, and health, and directed external relations at WSU Spokane for 14-1\/2 years before coming to WA Bikes. She served 4 years in the Idaho state legislature, the youngest woman ever elected to the House and then the Senate. Barb's personal bike blog can be found at bikestylespokane.com and she created the worldwide list womenbikeblogs.com (@womenbikeblogs on Twitter). Bikes: - \\\"Sweetie\\\": A Specialized Dolce from Wheel Sport Central in Spokane, which her husband Eric Abbott gave her when they were first dating. - The \\\"Mary Poppins\\\" bike: A Specialized Globe Daily 2 she likes for its upright posture and step-through design, purchased from Gregg's Cycle in Greenlake and modified by Bothell Ski and Bike to have a triple crank for Seattle hills. - \\\"Tessa\\\" (short for Tessaract): A Giant Expressway 2 folding bike she purchased at the WA Bikes Annual Gala\/auction. Barb and Eric have four children: Kate and Laura Chamberlain and Connor and Cailey Abbott.\",\"sameAs\":[\"https:\/\/x.com\/barbchamberlain\"],\"url\":\"https:\/\/wabikes.org\/index.php\/author\/barbchamberlain\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"John Wayne Pioneer Trail Recap and 2017 State Funding Request - Washington Bikes","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/","og_locale":"en_US","og_type":"article","og_title":"John Wayne Pioneer Trail Recap and 2017 State Funding Request - Washington Bikes","og_description":"Protecting and funding the John Wayne Pioneer Trail will be one of Washington Bikes&#8217; priorities [&hellip;]","og_url":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/","og_site_name":"Washington Bikes","article_published_time":"2016-10-20T14:05:59+00:00","article_modified_time":"2016-10-19T01:44:09+00:00","og_image":[{"url":"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg"}],"author":"Barb Chamberlain","twitter_misc":{"Written by":"Barb Chamberlain","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/","url":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/","name":"John Wayne Pioneer Trail Recap and 2017 State Funding Request - Washington Bikes","isPartOf":{"@id":"https:\/\/wabikes.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#primaryimage"},"image":{"@id":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#primaryimage"},"thumbnailUrl":"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg","datePublished":"2016-10-20T14:05:59+00:00","dateModified":"2016-10-19T01:44:09+00:00","author":{"@id":"https:\/\/wabikes.org\/#\/schema\/person\/a5601f2a2a881e2c8aa5d20933d90e10"},"breadcrumb":{"@id":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#primaryimage","url":"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg","contentUrl":"http:\/\/wabikes.org\/wp-content\/uploads\/2016\/07\/JWPT-Marilyn-Hedges-east-portal-Boylston-Tunnel-Yakima-Training-Center-pic-by-Mike-Sorensen-2016.-400x265.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/wabikes.org\/index.php\/2016\/10\/20\/john-wayne-pioneer-trail-recap-state-funding-2017-request\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/wabikes.org\/"},{"@type":"ListItem","position":2,"name":"John Wayne Pioneer Trail Recap and 2017 State Funding Request"}]},{"@type":"WebSite","@id":"https:\/\/wabikes.org\/#website","url":"https:\/\/wabikes.org\/","name":"Washington Bikes","description":"People who bike make a difference","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wabikes.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/wabikes.org\/#\/schema\/person\/a5601f2a2a881e2c8aa5d20933d90e10","name":"Barb Chamberlain","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/wabikes.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d4f2c2bb75879f5f06b9f567bc51f408?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d4f2c2bb75879f5f06b9f567bc51f408?s=96&d=mm&r=g","caption":"Barb Chamberlain"},"description":"Barb joined Washington Bikes as executive director Aug. 1, 2012, and led its merger with Cascade Bicycle Club that became official Jan. 1, 2016. She serves both organizations as Chief Strategic Officer. Her bike advocacy work started in Spokane thanks to WA Bikes (then called the Bicycle Alliance of Washington), which served as the initial inspiration and fiscal home for Bike to Work Spokane, founded by Barb in late 2007. She has served on a variety of boards and committees in transportation, public policy, and health, and directed external relations at WSU Spokane for 14-1\/2 years before coming to WA Bikes. She served 4 years in the Idaho state legislature, the youngest woman ever elected to the House and then the Senate. Barb's personal bike blog can be found at bikestylespokane.com and she created the worldwide list womenbikeblogs.com (@womenbikeblogs on Twitter). Bikes: - \"Sweetie\": A Specialized Dolce from Wheel Sport Central in Spokane, which her husband Eric Abbott gave her when they were first dating. - The \"Mary Poppins\" bike: A Specialized Globe Daily 2 she likes for its upright posture and step-through design, purchased from Gregg's Cycle in Greenlake and modified by Bothell Ski and Bike to have a triple crank for Seattle hills. - \"Tessa\" (short for Tessaract): A Giant Expressway 2 folding bike she purchased at the WA Bikes Annual Gala\/auction. Barb and Eric have four children: Kate and Laura Chamberlain and Connor and Cailey Abbott.","sameAs":["https:\/\/x.com\/barbchamberlain"],"url":"https:\/\/wabikes.org\/index.php\/author\/barbchamberlain\/"}]}},"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p36Q8O-45v","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/posts\/15717"}],"collection":[{"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/comments?post=15717"}],"version-history":[{"count":8,"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/posts\/15717\/revisions"}],"predecessor-version":[{"id":15726,"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/posts\/15717\/revisions\/15726"}],"wp:attachment":[{"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/media?parent=15717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/categories?post=15717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wabikes.org\/index.php\/wp-json\/wp\/v2\/tags?post=15717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}